{"id":12996,"date":"2026-03-23T08:45:29","date_gmt":"2026-03-23T07:45:29","guid":{"rendered":"https:\/\/nova-ava.de\/update-march-2026\/"},"modified":"2026-03-23T08:45:49","modified_gmt":"2026-03-23T07:45:49","slug":"update-march-2026","status":"publish","type":"post","link":"https:\/\/nova-ava.de\/en\/update-march-2026\/","title":{"rendered":"Update March 2026"},"content":{"rendered":"\n<p>Highlight in the March 2026 update &#8211; the new award proposal. 1. as a print list for the PDF award proposal, 2. as a new column in the cost analysis  <\/p>\n\n<p>Here you can find this update documentation as a <mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\"><strong><a href=\"https:\/\/nova-ava.de\/wp-content\/uploads\/NOVA-AVA-2026-03-Update.pdf\">PDF document<\/a>.<\/strong><\/mark><\/p>\n\n<h2 class=\"wp-block-heading\">The award proposal &#8211; new individual print list<\/h2>\n\n<p>That was still missing. The new &#8220;<a href=\"https:\/\/www.bauprofessor.de\/mitwirkung-bei-vergabe\/\" target=\"_blank\" rel=\"noopener\">Award proposal<\/a>&#8221; function can now fulfill two important requirements. Firstly, you can output a freely customizable PDF for your client for the award recommendation:  <\/p>\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"360\" src=\"https:\/\/nova-ava.de\/wp-content\/uploads\/image-50-1024x360.png\" alt=\"\" class=\"wp-image-12984\" srcset=\"https:\/\/nova-ava.de\/wp-content\/uploads\/image-50-1024x360.png 1024w, https:\/\/nova-ava.de\/wp-content\/uploads\/image-50.png 1350w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<p><\/p>\n\n<h2 class=\"wp-block-heading\">The award proposal &#8211; new values for the cost analysis<\/h2>\n\n<p>And secondly, we were able to expand the cost analysis. The project cost forecast now takes into account the bid values from the award proposal &#8211; and the previous workaround of &#8220;pre-commissioning&#8221; is no longer necessary. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"397\" src=\"https:\/\/nova-ava.de\/wp-content\/uploads\/image-51-1024x397.png\" alt=\"\" class=\"wp-image-12986\" srcset=\"https:\/\/nova-ava.de\/wp-content\/uploads\/image-51-1024x397.png 1024w, https:\/\/nova-ava.de\/wp-content\/uploads\/image-51.png 1362w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<h2 class=\"wp-block-heading\">Improvements must be made. And bugs out <\/h2>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Print<\/td><td>When outputting the &#8220;Table view&#8221; print list, page breaks within the table were sometimes generated too early, resulting in a lot of unnecessary white space. We have corrected this. <\/td><\/tr><tr><td>Print<\/td><td>Minor corrections have been made for the new placeholders {{contractTotals.xxxx}}.<\/td><\/tr><tr><td>Print<\/td><td>Even if several PDF documents have been defined as BOQ attachments, all attachments are now included in the BOQ printout.<\/td><\/tr><tr><td>Print<\/td><td>The SVG image format can now also be used as logo files for printing.<\/td><\/tr><tr><td>Building documentation<\/td><td>When sending logs by e-mail, the attachments to the individual log entries are now always included in the attached PDF of the log printout.<\/td><\/tr><tr><td>Building documentation<\/td><td>When creating new meetings, the participants from other meetings are no longer transferred.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Cost planning<\/td><td>The optional compilation in the cost planning output now also outputs the correct values under all sorting combinations.<\/td><\/tr><tr><td>Cost planning<\/td><td>When cost planning is output to other cost planning, referenced values ($KGR, e.g. $100 for the GB of DIN-KGR 100) are now correctly transferred to the target cost planning.<\/td><\/tr><tr><td>LV creation<\/td><td>Items that were copied from master BOQs were sometimes editable in the short and long text despite the existing reference to the master BOQ. This has been corrected. <\/td><\/tr><tr><td>LV creation<\/td><td>When editing a text supplement in the long text, the editing dialog now shows whether it is a bidder text supplement or a tenderer text supplement.<\/td><\/tr><tr><td>LV creation<\/td><td>When copying\/pasting text additions in the long text editor, bidder text additions and tenderer text additions are now copied correctly.<\/td><\/tr><tr><td>LV creation<\/td><td>Corrections have been made when editing changed STLV items directly after an STLV item update.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Invitation to tender<\/td><td>The notification e-mails to bidders upon submission\/approval of an offer are now sent correctly again, including the attached offer PDF. <\/td><\/tr><tr><td>Administration<\/td><td>URLs with special characters (valid URL encodes) can now also be saved in the &#8220;URL&#8221; feature type<\/td><\/tr><tr><td>Administration<\/td><td>The dialog to add a Heinze VOB user within the department\/text storage now works as expected again.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highlight in the March 2026 update &#8211; the new award proposal. 1. as a print list for the PDF award proposal, 2. as a new column in the cost analysis Here you can find this update documentation as a PDF document. The award proposal &#8211; new individual print list That was still missing. The new [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":12990,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[48],"tags":[],"class_list":["post-12996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/posts\/12996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/comments?post=12996"}],"version-history":[{"count":1,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/posts\/12996\/revisions"}],"predecessor-version":[{"id":12997,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/posts\/12996\/revisions\/12997"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/media\/12990"}],"wp:attachment":[{"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/media?parent=12996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/categories?post=12996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nova-ava.de\/en\/wp-json\/wp\/v2\/tags?post=12996"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}