Highlight in the March 2026 update – the new award proposal. 1. as a print list for the PDF award proposal, 2. as a new column in the cost analysis
Here you can find this update documentation as a PDF document.
The award proposal – new individual print list
That was still missing. The new “Award proposal” function can now fulfill two important requirements. Firstly, you can output a freely customizable PDF for your client for the award recommendation:

The award proposal – new values for the cost analysis
And secondly, we were able to expand the cost analysis. The project cost forecast now takes into account the bid values from the award proposal – and the previous workaround of “pre-commissioning” is no longer necessary.

Improvements must be made. And bugs out
| When outputting the “Table view” print list, page breaks within the table were sometimes generated too early, resulting in a lot of unnecessary white space. We have corrected this. | |
| Minor corrections have been made for the new placeholders {{contractTotals.xxxx}}. | |
| Even if several PDF documents have been defined as BOQ attachments, all attachments are now included in the BOQ printout. | |
| The SVG image format can now also be used as logo files for printing. | |
| Building documentation | When sending logs by e-mail, the attachments to the individual log entries are now always included in the attached PDF of the log printout. |
| Building documentation | When creating new meetings, the participants from other meetings are no longer transferred. |
| Cost planning | The optional compilation in the cost planning output now also outputs the correct values under all sorting combinations. |
| Cost planning | When cost planning is output to other cost planning, referenced values ($KGR, e.g. $100 for the GB of DIN-KGR 100) are now correctly transferred to the target cost planning. |
| LV creation | Items that were copied from master BOQs were sometimes editable in the short and long text despite the existing reference to the master BOQ. This has been corrected. |
| LV creation | When editing a text supplement in the long text, the editing dialog now shows whether it is a bidder text supplement or a tenderer text supplement. |
| LV creation | When copying/pasting text additions in the long text editor, bidder text additions and tenderer text additions are now copied correctly. |
| LV creation | Corrections have been made when editing changed STLV items directly after an STLV item update. |
| Invitation to tender | The notification e-mails to bidders upon submission/approval of an offer are now sent correctly again, including the attached offer PDF. |
| Administration | URLs with special characters (valid URL encodes) can now also be saved in the “URL” feature type |
| Administration | The dialog to add a Heinze VOB user within the department/text storage now works as expected again. |